Title:
Demolition Company Hamburg MOD
Guide To Editing & Modding Demolition Company - Steam Community
- Start with the small shed near the container terminal – it teaches you the port’s physics (collapsing roofs behave differently).
- Use the magnetic separator after primary demolition – Hamburg contracts often require steel recycling quotas.
- Watch for underground utilities – the map includes gas/water line cut missions (look for the blue/red markers).
- Be careful with debris drop zones – they are located on two barges (north and south of the map).
- Time limit contracts – the bridge section must be cleared within 15 minutes or the tide rises, blocking the barge access.
How to Choose the Right Modern Demolition Contractor (Checklist)
Hamburg has a vast stock of buildings built between 1950 and 1990. These contain PAH (coal tar) in floors, asbestos in insulation, and PCBs in sealants. A modern company must hold TRGS 519 certification (for asbestos) before the first hammer swings.
Because Hamburg jobs involve tight spaces and heavy debris:
