Pwd Dsr 2015-16 Maharashtra

Decoding the PWD DSR 2015-16 Maharashtra: A Comprehensive Guide for Contractors and Engineers

1. Arbitration and Contract Disputes

  • Market rate surveys conducted in district headquarters and major talukas during March–April 2015.
  • Minimum wages for construction workers under the Maharashtra Minimum Wages Rules (revised for 2015).
  • Hire charges for machinery (as per CPWD and PWD Maharashtra guidelines).
  • Lead and lift charges for materials (up to 5 km lead free; beyond that, additional carriage costs applied).

Road and Bridge Works

: Specific costs for sub-grade preparation, surfacing, and structural components of bridges and culverts.

. It serves as the "bible" for contractors and engineers to estimate the cost of government infrastructure projects like roads, bridges, and buildings. The Story of the "Blue Book" Pwd Dsr 2015-16 Maharashtra

| Equipment | Capacity | Rate per day (₹) | |-----------|----------|------------------| | Hydraulic excavator | 0.9 cum | 7,500 | | Dozer D-50 | – | 8,000 | | Vibratory roller | 8-10 tonnes | 6,200 | | Concrete mixer (diesel) | 200 liters | 1,200 | | Water tanker | 6,000 liters | 1,800 | Decoding the PWD DSR 2015-16 Maharashtra: A Comprehensive

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Discover more from life thru my hazel eyes

Subscribe now to keep reading and get access to the full archive.

Continue reading

Discover more from life thru my hazel eyes

Subscribe now to keep reading and get access to the full archive.

Continue reading

You have successfully subscribed to the newsletter! Thank you.

There was an error while trying to send your request. Please try again.

life thru my hazel eyes will use the information you provide on this form to be in touch with you and to provide updates and marketing.