Virar-alibaug Multimodal Corridor Route — Map
Virar-Alibaug Multimodal Corridor (VAMC) is a 126 km-long planned project in the Mumbai Metropolitan Region (MMR) that aims to reduce travel time between Virar and Alibaug from four hours to approximately two. Route & Major Connectivity The corridor starts at ) on the Mumbai-Ahmedabad Highway (NH-48) and terminates at ) in Raigad
By 2030, the VAMC route map will not stand alone. It will connect to: virar-alibaug multimodal corridor route map
- Bolinj – Crossing over Vasai Creek (new bridge).
- Vasai (East) – Interchange for Vasai–Bhiwandi road.
Features:
Land-use, environmental, and social considerations
Palghar, Thane, and Raigad
The corridor spans across three major districts: . It starts at Navghar near Virar in the north and terminates in Alibaug in the south. The route is strategically planned in two distinct phases: Virar-Alibaug Multimodal Corridor (VAMC) is a 126 km-long
- Kaman Creek Crossing: A major engineering feat crossing into the Thane district.
- Bhiwandi: The corridor passes through the textile town’s rural periphery. The map shows a major interchange at Bhiwandi Bypass (NH-3). This is critical for freight movement.
- Kasarvadavali: Located along the Ghodbunder Road, the map indicates a flyover connecting to the upcoming Thane-Bhiwandi-Kalyan road.